Portfolio
GENERAL
- Ho & Lee Engineering Consultants is an engineering consultancy specialising in building services in Electrical, Mechanical, Fire Alarm, Security and Communication disciplines and ASP L3 reticulation and substation design.
- Significant growth has been experienced since inception in 1993.
- The firm has a CADD and plotting facility and uses up to date software in both administrative and technical areas.
- We have both inhouse Design Building Practitioners in Electrical, Fire Alarm and Mechanical (Ventilation & Air- conditioning) Services- Registration Number DEP 1535 and DEP 513.
Portfolio
Experience
Examples of our clients and the projects we have undertaken
Kapau Holdings (Mr. Tom Hu Tel.: 02 9299 9987)
- 39 - 41 Belmore Street, Burwood - Residential development. The project comprises 4 levels of underground car parking levels, three residential towers total 493 Nos. of mixed studio, 1 bed, 2 bed and 3bed units. Included in the project are 17 Nos. of retail shops on Ground Floor and 3650 sq.m of Council office space. Mechanical and Electrical services. Documentation was completed previously but now re-document due to revised DA.
- Corner of Doncaster Avenue and Ascot Street, Randwick - Residential development. Project comprising 5 blocks of residential building with one level of underground car parking and total 84 residential units and townhouses and a community centre. Electrical and Mechanical services. Documentation completed.
- Fit out design for a new office level at 399 Sussex Street, Sydney. Construction completed.
- New Residential Development at 160-166 Anzac Parade, Kensington which is a 12 Storey Development consisting of 54 apartments and two shops and basement carparking. Electrical, Fire Alarm and Mechanical Services. Documentation stage.
MGA Architects Pty Ltd (Mr. Albert Au Yeung Tel.: 0414 964812)
- Residential Development at 26 Pacific Highway, Roseville which consists of 22 residential apartments and basement carparking. Electrical and Fire Services. Documentation in progress.
- Residential Development at 2-4 Willeroo Street, Lakemba which consists of 16 residential apartments and basement carparking. Electrical, Mechanical and Fire Services. Documentation completed and construction in progress.
- Residential development at 15-17 Strachan Street, Kingsford which consists of 29 units. Electrical, Fire Alarm and Mechanical Services. Documentation completed.
- Boarding house development at 6 Forsyth Street, Kingsford which consists of 13 rooms. Electrical, Fire Alarm and Mechanical Services. Documentation completed.
- Industrial Warehouse and Office Development at 5-7 Platinum Street, Crestmead, Qld. Electrical, Fire Alarm and Mechanical Services. Construction in progress.
- Retail and Commercial Development at 221 Morrison Road, Putney which consists of 3 shops on Ground Floor (including an IGA Supermarket) and a child care centre on first floor + basement carpark. Electrical, Fire Alarm and Mechanical Services. Construction in progress.
- 8 – 10 Allawah Street, Blacktown – Residential Development. The project comprises 2 levels of basement carparking and 78 residential units. Electrical and Mechanical services. Construction completed.
- 629 Harris Street, Ultimo – Residential Development which includes building a new resident at the back of the site. Electrical, Fire Alarm and Mechanical Services. Documentation stage.
D- Studio Architects (Mr. Simon Tso Tel.: 02 9283 0789)
- Refurbishment of a 5 level Hotel at 383 – 389 Bulwara Road, Ultimo. Electrical and Mechanical Services. Documentation completed.
- Two residential dwellings located at 56 Brandling Street, Alexandria and 10 Cottesloe Street, Greenhills Beach. Electrical Services. Documentation completed.
- School refurbishment at 225 Clarence Street, Sydney. Electrical and Mechanical Services. Completed.
- Apartment block at 1 Carlton Street, Granville. Electrical & Mechanical Services. Completed.
- 18 Apartments at 17 -23 Dressler Court, Holroyd Garden. Electrical & Mechanical Services. Construction completed.
- 50 Apartments at 92 Cope Street, Waterloo, Electrical and Mechanical Services. Construction completed.
- Residential Development at 13 – 15 Anglo Road, Campsie, Electrical and Mechanical Services, Documentation completed. Construction completed.
- Residential Development at 34 – 40A Falcon Street, Crows Nest. Electrical and Mechanical Services, Construction completed.
- Residential Development at 6-10 Bowral Street, Kensington which is a 12 Storey Development with 60 apartments and 4 shops. Electrical and Fire Alarm Services. Documentation in progress.
- Refurbishment of a heritage church located at 518 Pacific Highway, Lane Cove North which consists of a Sandstone Chapel, a parsonage, main hall, side halls and Sunday School Building. Electrical, Fire alarm, security, CCTV system and Mechanical (Airconditioning and Ventilation ) system design. Documentation stage.
Empire Project Management (Mr. Nathan Gallon Tel.: 0438534750)
- Refurbishment of Mt. Annan Hotel at 12 Main Street, Mt. Annan. Electrical and Fire Alarm Services. Documentation completed.
- Refurbishment of Courthouse Hotel at Corner of Bourke Street and Oxford Street, Taylor Square. Electrical and Fire Alarm Services. Documentation completed.
- Refurbishment of Fitzroy Hotel at 161 George Street, Windsor. Electrical and Fire Alarm Services. Documentation completed.
- Refurbishment of El Cortez Hotel at Corner of Canley Vale Road and Avoca Street, Canley Heights. Electrical and Fire Alarm Services. Documentation completed.
Perry Fung Architects (Mr. Michael Fung Tel. No. 99062321)
- Residential Development at 258 Pacific Highway, Crows Nest. Electrical and Mechanical Services, Completed.
- Residential Development at 114- 116 Cabramatta Road, Crows Nest which consist of 41 residential units, 2 shops and one restaurant. Electrical and Mechanical Services. Completed.
- 4 storey Office Refurbishment at 241 – 243 Castlereagh Street, Sydney. Electrical and Mechanical Services. Completed.
- Services Relocation for Northmead Shopping Centre. Electrical Services. Documentation Completed.
- Northmead Shopping Centre extension. Electrical & Mechanical and Airconditioning Services. Completed.
- John Azzi Hair Dresser Fit out design at Level 11, 61 – 63 Market Street, Sydney. Electrical & Mechanical Services. Documentation completed.
- Fit out design for Ermenegildo Zegna store at 155 Edward Street, Brisbane. Electrical and Mechanical Services, construction completed.
- Fit out design for Chopard shop at 119 King Street, Sydney. Electrical and Mechanical Services, construction completed.
- Fit out design for Swiss Concept at 90 Pitt Street, Sydney. Electrical and Mechanical Services, documentation completed.
- Fit out design for the 3level commercial building at 300 Forest Road, Hurstville for Swiss Concept. Electrical and Mechanical Services. Construction completed.
- Refurbishment of shops at 163-165 Rowe Street, Eastwood. Electrical, Fire Alarm and Mechanical Services. Documentation and Construction Completed.
- Building refurbishment for 2 level commercial building at 88 – 92 Main Street Blacktown which consist of Ground Floor fitness centre, First Level training school. Electrical, Fire Alarm and Mechanical Services. Documentation in progress.
Max Sgamotta Architects Pty Ltd (Mr. Max Sgamotta Tel.: 0412396278)
- Residential Development at 928-930 Anzac Parade, Maroubra which consists of 26 units, 4 shops and basement carparking. Electrical, Fire Alarm and Mechanical Services. Construction completed.
- Boarding House Development at 31 Middle Street, Kingsford which consists of 14 rooms and carparking. Electrical, Fire Alarm and Mechanical Services. Documentation completed. Construction completed.
- Residential Development at 219 Maroubra Road, Maroubra which consists of 112 units and 4 shops and carparking. Electrical, Fire Alarm and Mechanical Services. Construction completed.
- Boarding House Development at 39-41 Borrodale Road, Kingsford which consists of 28 rooms. Electrical, Fire Alarm Services. Construction in progress.
Brewster Murray - Architects
- 8 – 10 Grosvenor Street, Kensington- Residential development. Mechanical and Electrical services. Documentation completed.
- Refurbishment of retirement village at 61 – 67 Moverly Road, Maroubra. Electrical services. Documentation in progress.
- 343-345 Pitt Street, Sydney - Residential development. The project comprises five levels of underground car parking levels, seven levels of above ground carparking and a 39 level residential tower of 296 units. Included in the project are a number of retail shops on Ground Floor and a recreation area on level 8. Mechanical and Electrical services. Construction completed.
- 755 George Street, Sydney - Commercial/Residential development. Project comprising 5 levels of underground car parking, 2 commercial floors and 11 levels totaling 81 residential units. Electrical services. Construction completed.
Telstra offce fitouts and refurbishment
- Building report 16-18 Wentworth Street, Parramatta
- 545-553 Kent Street, Sydney
- 16-18 Wentworth Street, Parramatta
- Railway Parade, Burwood
- Level 19 Telecom House
Group home development at
- 53 Brisbane Street, Cowra
- 305 Darling Street, Dubbo
- 28 Cowper Street, Taree
- 12 Cabramurra Street, Heckenberg
- 12-14 Wyatt Ave., Padstow
- 114 Kearneys Drive, Orange
- 59 Wallace Street, Nowra
- 19 – 27 Boronia Street, South Gransville.
Electrical and mechanical services, documentation completed.
- Endeavour Energy Depot refurbishment at 19 McPherson Road, Smeaton Grange. Electrical and Mechanical Services. Construction completed.
- Residential development at 41 Gerald Street, Cremorne. Mechanical Services. Construction in progress.
RS Property Services Company
- Fit-out for Chinese Cultural Centre, Citadel Towers Plaza. Electrical, Mechanical & Fire Services. Completed.
- Airconditioning system modification at Citadel Towers, Chatswood. Completed.
- Office refurbishment for SRA at 8 Moore Street, Liverpool. Electrical, Mechanical & Fire Services. Construction completed.
Austin Australia
- Metropolitian Remand and Reception Centre at Silverwater, consisting of more than 400 cells. Completed.
- Lead-in-fighter hangar and maintenance facility at New Castle Airport. Documentation completed.
- Residential and showroom development at 41 - 45 Pacific Highway, Waitara. Electrical and Mechanical Services. Construction completed.
JLW Management Services
- Harmonic investigation for Citadel Towers. Investigation completed.
- Power factor correction equipment for Citadel Towers. Completed.
- Varidrive Design for Chillers at Citadel Towers. Completed.
- Tender report & commissioning for power factor correction equipment at 32 & 50 Berry, 32 Walker and 90 Mount Street, North Sydney and 601 Pacific Highway, St. Leonards. Completed.
- Electrical and Mechanical Services Inspection and preparation of report of two multi-level office towers located at 1 Railway Parade, Chatswood. Completed.
- Kitchen Exhaust documentation for Ground Floor Restaurant located at Chatswood Central, Chatswood. Completed.
- Electrical and Mechanical Services Inspection and preparation of report for a 15 level office building located at 90 Arthur Street, North Sydney. Completed.
- Main switch board modification and power factor correction equipment for Chatswood Central, Chatswood. Completed.
- Modification of standby power system for the 19 level commercial building located at 338 Pitt Street, Sydney. Completed.
Simon Chan & Associates
- 42 unit development at 6 – 14 Hogben Street, Kogarah. Electrical & Mechanical services. Documentation stage.
- Refurbishment of Harbour Plaza, 25-29 Dixon Street, Haymarket which consists of four office floors, one floor culture club, three floors of food court and restaurant and two levels of residential apartments. Electrical, Mechanical, Fire Services. Completed.
- 9 storey residential tower with 83 units and 21 townhouses at 24-32 West Street, North Sydney. Electrical, Mechanical & Fire Services. Construction completed.
- 15 storey office building refurbishment at 88 Pitt Street, Sydney. Mechanical, Electrical & Fire services. Completed.
- Shopping centre refurbishement at 208-216 Forest Road, Hurstville. Mechanical, Electrical & Fire Services. Completed.
- Residential Development at 8 – 12 Hornsey Road, Homebush West. Electrical Services. Completed.
- 4 level office refurbishments at 40 – 50 Francis Street, East Sydney. Electrical and Mechanical Services. Documentation in progress.
Woolworths Supermarket
Electrical refurbishment of the following stores:-
- Gosford ( under construction )
- Eastwood ( completed )
- Erina ( completed )
- St. Ives ( completed )
- Neutral Bay ( completed )
- Marsfield ( completed )
Site supervision and Construction of the following new stores:-
- Muswellbrook ( under construction )
- Hornsby ( completed )
- Cecil Hills ( completed )
- Rosehill ( completed )
Conversion of the following Franklins stores to Woolworths Supermarket:-
- Marrickville ( completed )
- Thornleigh ( completed )
- Avalon ( completed )
- Beatau Bay ( completed )
- Lane Cove ( completed )
- Chatswood ( completed )
- Belrose ( completed )
- Charlestown ( completed )
Preparation of the new Standard Electrical Drawings for Woolworths Supermarket – completed.
Garrison Ash Aged Care Leasing and Development
- Extension and refurbishment of Fairlea Nursing Home, 11 Hawk Street, Penshurst. Electrical, Mechanical & Hydraulic Services. Completed.
- Extension and refurbishment of Kaloola Nursing Home, 11 Crown Street, Harris Park. Electrical & Mechanical Services. Completed.
Level 3 Services (External Electrical Reticulation Design)
We have also carried out the following external electrical reticulation design for certification of Integral Energy and Ausgrid:-
Substation design for:-
- Bayview Village, 36 Cabbage Tree Road, Bayview
- 94 – 98 Beamish Street, Campsie
- 222 Botany Road, Alexandria
- 133 Terralong Street, Kiama
- 11 Loftus Street, Wollongong
- 134 Kanahooka Road, Kanahooka
- 134 Kanahooka Road, Kanahooka
- Port Botany Boat Ramp facility
- Thirroul Plaza shopping centre
- Thirroul Plaza shopping centre
- 26 -36 Cairds Avenue, Bankstown
- New Kiosk Substation at 41-43 Anzac Street, Greenacre
- New Kiosk Substation at Muswellbrook Aquatic Centre, Muswellbrook
- Northmead Plaza Shopping Centre
- Karee Rhodes Residential Development for Mirvac.
- 15 Anglo Road, Campsie
- 49 Percival Road, Smithfield
- 31 – 35 Devonshire Street, Chatswood
- 8 – 32 Jasmine Street, Botany
- 38 – 44 Pembroke Street, Epping
- 5 -9 Waitara Avenue, Waitara
- 3 -5 Wiseman Avenue, Wollongong
- 2 Bouvardia Street, Asquith
- Indoor substation design for 13 – 21 Arncliffe Street, Wolli Creek
- New Kiosk Substation at 8 Bessemer Street, Blacktown
- New Kiosk Substation at 15-17 Strachan Street, Kingsford
- New Kiosk Substation at 80 Ninth Avenue, Austral
Asset relocation design for:-
- 16 – 20 New Dapto Road, Wollongong
- Corner of Mark and South Kiama Drive, Kiama
- 22 Cowan Road, St. Ives
- 16 Bayview Street, Lavender Bay
- 43 Cranbrook Street, Botany
- 2 to 4 Willeroo Street, Lakemba
- 79 Malton Road, Beecroft
Design to uprate existing electrical network to obtain power supply:-
- 126 – 128 Aurora Drive, Tregear
- 7 – 9 Ocean Street, Wollongong
- 143 Scott Street, Shoalhaven Heads
- 14 – 24 Parramatta Road, Strathfield
- 129 Victoria Avenue, Chatswood
- 139 – 147 Mitchell road, Alexandria
- 41 – 45 Claude Street, Chatswood
- 52 Yarrara Road, Pennant Hills
- 55 Blaxland Road, Ryde
- 26 Garland Crescent, Bonnyrigg Heights
- 11-13 The Sevenway, Rockdale
- 3 Ellis Street, Chatswood
- 6 Forsyth Street, Kingsford
- 10 Monash Road, Gladesville
- El Cortez Hotel at 337 Canley Vale Road, Canley Heights